Prockets logoProckets
What We Do

From clinic to comfort.

Getting a prosthetic limb to someone already has a path. Referral, assessment, casting, fitting, follow-up care. Prockets doesn't replace it. We supply the modular system that moves along it.

  1. 01

    Patient referral

    A patient is referred for assessment through the existing EnableNSW pathway.

  2. 02

    Assess & cast

    An EnableNSW-accredited clinic assesses and casts the patient.

  3. 03

    Manufacture

    Built in-house on existing EnableNSW infrastructure, or centrally by Prockets when clinic capacity is limited, so throughput is never capped by a single site.

  4. 04

    Fit & maintain

    The clinic fits the device and provides ongoing care and maintenance.

None of this asks a clinic to change how it operates. EnableNSW accredits providers to assess, cast, manufacture, fit and repair prostheses — 7 commercial and 2 public services across NSW. Prockets supplies modular components into that network, clinics keep their fitting, manufacturing and maintenance revenue, and their existing accreditation and infrastructure carry over unchanged.

9
NSW prosthetic services
2
Manufacturing paths
0
New infrastructure
Ongoing Care

Replace the component, not the prosthesis.

Modules connect through standardised interfaces, so a worn part is swapped on its own. No full remanufacturing, which is what keeps lifetime cost down, not just the first fitting.

  1. 1

    Damaged module

    A single component wears, breaks or needs upgrading.

  2. 2

    Disconnect

    Released at a standardised mechanical interface.

  3. 3

    Replace module

    A new part is fitted — no remake of the surrounding assembly.

  4. 4

    Reassemble

    Back together, with the patient's existing fit intact.

Regulatory Pathway

A defined route through the TGA.

Patient-matched medical device
Supplied as a patient-matched medical device (PMMD), in collaboration with partner clinics.
ARTG inclusion exempt until 1 July 2029
Under the PMMD pathway, ARTG inclusion is exempt until 1 July 2029, a defined window to complete the evidence requirements.
Full ARTG transition from 1 July 2029
We're preparing for full ARTG inclusion and ongoing TGA compliance beyond that window.
Talk to us about a pilot